by HydroBoost Ltd | Jun 9, 2023
HydroBoost clears floaties and scum in 2 weeks A Dairy Farmer in Canterbury had a problem with his effluent clip tank. The surface had grown with vegetation up to 400mm in height across the pond. It was effectively ‘dead’ and was not usable. There was no effluent...
by Smart Websites | Jun 1, 2023
What was the problem? This Effluent pond, (roughly 1,800m2 surface) had a HydroBoost unit installed in Feb 2022. It was working well with reductions in NPK concentrations till a power surge to the Dairy Farm damaged the HydroBoost unit in Nov 2022. With the HydroBoost...
by HydroBoost Ltd | Jun 1, 2023
Sludge breaking up on pond bottom The challenge this farmer manager faced was continual nozzle blockages in the effluent dispersal infrastructure. This was costing time (always in shortage on a Dairy Farm) and loss of a natural resource being applied to pasture....
by Smart Websites | May 30, 2023
Floaties and Effluent Scum Dissolve within 4 weeks This 2,500m2 effluent pond was clogged up with an Effluent crust. Within 4 weeks HydroBoost had dissolved half of it. The Effluent pond in the Ashburton area of Canterbury started crusting up on October 2022. The...
Recent Comments